Fig-Pico Hotel Mat Foundation Pour

Largo poured the massive mat foundation for a new high-rise tower in downtown Los Angeles on Saturday night. Located on the northeast corner of Figueroa and Pico, the hospitality development will add 727 rooms when complete in 2022.

National Readymix began service to the site at 1AM, and it took 7 pumps nearly 11 hours to pour 7,096CY.

The building will consist of 37 total levels which includes a concrete roof. Building services are located in the basement with 11,000sf of retail space on street level. Six levels of above grade parking followed by a pool deck with outdoor restaurant space make up the first eight levels. Hospitality levels are shared between the AC and Moxy Hotel brand names with 347 and 380 keys respectively. Largo Concrete is working with Lightstone developers, general contractor Suffolk Construction, Gensler architects and Saiful Bouquet structural engineers to be poured out in late 2021.

Mat Foundation Pour Time-Lapse Video

[print_gllr id=8571]