Tag: topping-out

Project News

Los Angeles Mega-Development Circa Tops-Out

Earlier this month, Largo topped-out at Circa, 1200 S. Figueroa Street in Los Angeles. The focal point of this $500 million residential mega-project is the twin high-rises adjacent to the Staples Center in downtown Los Angeles.  The development features two levels of below-grade parking, ground level commercial space, six levels of above-grade parking, an amenities podium deck, and 26 stories of residential condominiums above. Located near LA Live, the Convention Center and the Metro Pico Station in the city’s South Park district, the high-rise buildings feature a curved north face to enhance views of the skyline and mimic design themes from surrounding architecture. When complete, the project will total nearly 110,000 cubic yards of concrete installed over nearly 600,000 man-hours. Project Credits: Harley Ellis Devereaux, Architect; Cary Kopczynski & Co., Structural Engineer; LendLease Corp., General Contractor; Holliday Rock Co., Ready-Mix Supplier.

[print_gllr id=3470]

Project News

Britannia Cove Parking Structure Tops Out

Earlier this month, Largo topped out on the 9.5 level Britannia Cove at Oyster Point parking structure in South San Francisco. Located east of the 101 and north of Oyster Point Blvd., the structure features a total of 2,080 stalls spread across 721,250gsf. Designed by architect International Parking Design and structural engineer Culp & Tanner, this long-span, moment frame structure features a radius curve to match the Oyster Point Blvd. bridge over the 101. Working with general contractor Hathaway Dinwiddie, the structure will serve the new multi-tenant campus for life science and technology industries when complete in January 2018.

[print_gllr id=3881]

Project News

Homewood Suites in Austin Tops Out

Largo topped out at the Homewood Suites in Austin, Texas last month. Working with general contractor DD&B Construction and designed by Phillips Partnership and DCI Engineers, the high-rise concrete frame building stands 17 stories on the eastern boundary of Austin’s Rainey Street District. With a total of 150 rooms across 200,369gsf, the first four levels will be designated for parking and are hidden by a metal facade which carries up the building’s core to the roof.

[print_gllr id=7065]

Project News

Santa Monica Gateway Tops Out

Largo topped-out at the Santa Monica Gateway project last month working with general contractor McCormick Construction, DRDS Architecture and SE Solutions structural engineers. The 200,000sqft creative office complex will consist of two separate 4-story concrete, LEED certified buildings. The combination of concrete, glass and metal structures sits atop a three level subterranean parking garage offering 640 stalls. Located on the corner of Stewart Street and Colorado Avenue in Santa Monica’s new Bergamot Transit Village, the project is scheduled for completion third quarter 2017.

[print_gllr id=3972]

Project News

Santa Clara Square Phase 1 – Parking Structures and Apartment Podiums

Largo Concrete recently topped-out on two wrap parking structures and residential podiums at the Santa Clara Square development. Located south of the 101 and east of Bowers Avenue, the residential component of this 90 acre mixed-use development will consist of 1,778 units across seven separate five story buildings. The seven apartment buildings each have a dedicated parking structure and are to be constructed in three phases. Working with GC Western National Contractors and the design team of MVE + Partners and DCI Engineers, Largo worked with the same team for the same owner, the Irvine Company, on three large residential podiums in Playa Vista, CA in 2014.

[print_gllr id=4884]

Project News

7007 Romaine Tops Out

Construction is moving forward on the 7007 Romaine project in the Hollywood Media District, with Largo pouring our last structural deck earlier this month. When complete, this 153,000gsf structure will feature 60,000sqft of office space with balconies, outdoor decks and floor-to-ceiling windows. The two levels of office space will sit atop a 4 level parking garage which provides 298 stalls with retail space on the ground floor. Close to the 101 freeway and bordering West Hollywood, the development is planning to open in the third quarter of 2017. We are working with Shubin + Donaldson ArchitectsJLA Structural Engineers and general contractor the CIM Group to deliver to project on-time and within budget.

[print_gllr id=3699]

Project News

Station Park Green Phase 1

Putting the finishing touches on the Station Park Green wrap parking structure and apartment podium in San Mateo this April. This is the first of four phases on the 12 acre site located between South Delaware and El Camino Real along SR92 in San Mateo and will provide 192 residential units when complete. The 5 level parking structure provides 167 stalls across 118,044gsf and the retail/commercial podium added another 44,786sf of structural concrete scope of work on this phase. Working with general contractor Suffolk Construction and A/E designers MVE Partners and FBA Structural Engineers, this development seeks a LEED Gold Certification.

[print_gllr id=6613]

Project News

Creekside Parking Structure Near Completion

Just a couple miles east of our Northern California office, Largo recently completed the Creekside Parking Structure with South Bay Construction. Designed by Arc Tec, Inc. and Structural Engineers, Inc., the 8.5 level parking building will house 828 stalls across 277,832gsf. The structure will serve a new commercial office building and the existing Courtyard by Marriott, a cast-in-place, mid-rise building which Largo also constructed back in 2011. The south elevation is enclosed with CMU block and shotcrete was utilized for interior walls and parapets.

[print_gllr id=7052]

Project News

USC Michelson Center for Convergent Biosciences

Largo recently completed the 225,000gsf Michelson Center for Convergent BioSciences at the University of Southern California. The facility will be home to an interdisciplinary team of researchers from the Dornsife College of Letters, Arts and Sciences with the Viterbi School of Engineering. The building features one basement level and four levels above grade and will house high-tech medical equipment including a nano-fabrication facility and an electron microscope. The exterior of the building features two story tall concrete arches at both entrances and exposed, board-form architectural concrete finish on the interior face of the perimeter walls. Designed by HOK  with John A. Martin & Associates as the structural engineer, Largo worked with general contractor DPR Construction to deliver this project on-time and under budget.

[print_gllr id=3894]

Project News

Irvine Spectrum Marriott Tops Out

Largo topped out at the Irvine Spectrum Marriott earlier this week with general contractor RD Olson and design team WATG and PK Associates. This 16 level structure is all above grade and will feature 271 rooms across 205,000gsf. Located on the southeast corner of Irvine Center Drive and Gateway the hotel is scheduled to open during the summer of 2017. Largo poured a mini-mat foundation of 2,500CY and used our own formwork caddy to move perimeter deck tables from one level to another.

[print_gllr id=7038]