Largo was the structural concrete contractor on the 1200 S. Figueroa Street in Los Angeles. The focal point of this $500 million residential mega-project is the twin high-rises adjacent to the Staples Center in downtown Los Angeles.  The development features two levels of below-grade parking, ground level commercial space, six levels of above-grade parking, an amenities podium deck, and 26 stories of residential condominiums above. Located near LA Live, the Convention Center and the Metro Pico Station in the city’s South Park district, the high-rise buildings feature a curved north face to enhance views of the skyline and mimic design themes from surrounding architecture. Largo placed a total 110,000 cubic yards of concrete installed over nearly 600,000 man-hours. Largo worked with architect Harley Ellis Devereaux, structural engineer Cary Kopczynski & Co., general contractor LendLease Corp. and Holliday Rock Co. was the ready-mix supplier.

Location: Los Angeles, CA

Levels: Two levels below grade parking, ground level retail, six levels of parking and 26-Stories of residential.

Complete: July 2017

Client: Lendlease

Architect: Harley Ellis Devereaux

Engineer: Cary Kopczynski & Company

Awards: 2017 ACI Pankow Award