Midfield Satellite Concourse South
Location: El Segundo, CA
Market Sector: Transportation
Gates and Levels: Foundations for two levels above grade slab on metal deck offsite construction and relocation for eight narrow-body airline gates.
Gross Sq. Ft.: 157,916sf
Complete: June 2024
Client: W.E. O’neil
Architect: Woods Bagot
Engineer: Buro Happold Consulting Engineers
Award: 2026 ACI Southern California Chapter, Infrastructure Category
MSC South adds eight narrow-body aircraft gates across 157,916 square feet using an accelerated Offsite Construction and Relocation (OCR) method, the first of its kind at LAX and only the third deployed at a U.S. airport. The two-story facility was constructed in nine segments approximately 1.5 miles from the project site, then transported and assembled in place under carefully controlled conditions. This innovative approach streamlined construction by minimizing onsite labor requirements, reducing security-related constraints, and limiting impacts to ongoing airport operations.
Supporting LAX’s capacity expansion ahead of the 2026 FIFA World Cup and the 2028 Olympic and Paralympic Games, MSC South was designed to complement the recently renovated Tom Bradley International Terminal and West Gates. The L-shaped, eight-gate concourse connects directly to the West Gates passenger corridor at the second level.
Each of the nine segments measures approximately 80 feet by 110 feet by 40 feet, weighs up to 1,000 tons, and was nearly fully completed before transport. Building the structure offsite addressed the logistical and security challenges of working within an active airport environment.
Largo’s scope of work supported both the off-site modular construction yard and the airside installation area, providing the structural foundation necessary for the relocation and slab on metal deck for the prefabricated MSC South concourse. The concrete scope was executed through approximately 32,600 man hours with zero recordable safety incidents. Work was performed under highly constrained logistical conditions within an active international airport environment, requiring adherence to rigorous safety, security, scheduling, and operational requirements.
Off-Site Construction Area
Largo poured nearly 1,400 cubic yards of concrete of slab on metal deck at the Off-Site Modular Development yard. In addition to the SOMD, this work also included construction of concrete pads and structural support elements used for fabrication, assembly, staging, and preparation of the nine concourse segments prior to transport. The off-site work facilitated a controlled construction environment that minimized impacts on active airport operations while allowing significant portions of the building systems to be completed before delivery to the airfield.
Airside Construction Area
Within the secured airside environment, crews placed over 6,000 cubic yards of concrete in foundations and slab-on-grade construction supporting the new Midfield Satellite Concourse South facility. Largo’s scope included excavation, formwork, reinforcing steel placement, and concrete installation for spread footings and structural foundations. The slab-on-grade areas were designed to support the relocated concourse segments and associated airport operational loads. Construction sequencing and quality control activities performed in accordance with strict building tolerances, airport security, safety, and ongoing operational requirements. Coordination with structural steel, transport, and erection teams was also critical to ensure foundation tolerances met the precise requirements necessary for placement of the transported building segments. Consistency at the airside site was at a premium with teams working night shifts to accommodate limited work times and dealing with constantly changing haul routes to the site. Security required each ready mix truck be escorted along the tarmac to and from the site and teams had to be prepared to change the route at a moment’s notice at the direction from the control tower.
Anchor Bolt Installation
A critical component of the project included the installation of 165 anchor bolts embedded within the slab-on-grade and foundation system. These anchor bolts were positioned to support the unique structural connection strategy developed for the modular relocation process. The anchor assemblies were recessed below the finished concrete surface and incorporated coupling nuts within protected cavities, allowing self-propelled modular transporters (SPMTs) to travel unobstructed across the foundation surface prior to final segment placement. Largo’s layout team was responsible for surveying, placement verification, and quality assurance measures required to maintain the stringent tolerances necessary for accurate alignment of the relocated concourse modules.
Workforce and Execution
The effort supported the successful implementation of LAX’s innovative off-site construction methodology while maintaining uninterrupted airport operations.