Westfield UTC Masonry
Largo recently installed over 100,000 Concrete Masonry Units (CMU), 20,000 sq. ft. of Texas Limestone at the Westfield UTC Mall in La Jolla, CA. In addition to the installation of precast bases, ledges, wall caps, manufactured stone, and thin brick.
[print_gllr id=7238]