Yearly: 2021

Project News

APEX Tops Out in San Diego

Perched along Towne Centre Drive in San Diego, CA, the new APEX commercial office building has impressive views of Sorrento Valley to the east. Largo topped out with general contractor Rudolf & Sletten on the 345,000gsf structure which has been leased to Apple. Designed by Perkins & Will architects and Coffman Structural Engineers the building has two levels of below grade parking with five levels of above grade including the roof.

Designers attempted to integrate modern architecture with the surrounding biodiversity to enhance the user well-being. Exposed concrete walls blend with extensive glass and steel accents on the exterior façade. The concrete roof deck is also exposed and cantilevers toward the canyon sheltering the outdoor terrace on level four. There is a total of 37,000sf of exterior architectural concrete on the project which includes feature walls, columns, and sloped soffits. All exposed elements were designed with dimensioned seam plywood layout for a consistent special finish. A computer generated solar study was used to determine the most effective placement of sunshade elements to maximize daylight and visual connections to the environment.

Amenities include a fitness center, an outdoor workout area, volleyball court and game area with horseshoe and corn-hole space. A cafe, amphitheater and flexible workspaces round out the amenities and blend with the architectural features to produce a unique creative space. In total Largo pour over 27,000CY of concrete over the 10.5 month schedule.

Project News

Hawthorne Elementary Tops Out and 701 Magnolia Ramps Up

The Hawthorne Elementary School topped out this month in Dallas, TX earlier this month. The low-rise project is two levels above grade totaling 81,500gsf with a 6′ tall mini basement or crawl space below. The first elevated deck above the void is cast-in-place with level two being a combination of concrete and slab-on-metal-deck. Largo is also doing the site concrete scope for the facility scheduled to open during the Fall of 2021. This is our first project with Imperial Construction, Glen Partners Architects and Alpha Consulting Engineers and we look forward to many more in the future.

701 West Magnolia
Forty miles to the west in the Near Southside district of Fort Worth, Largo is beginning construction on the 701 W Magnolia development with general contractor Muckleroy & Falls. The four level creative office building has retail on the ground floor which runs along an open-air mall. On the opposite side of the mall features historic buildings dating back 100-years . A three level parking structure is also included in the development designed by VLK Architects and L.A. Fuess Partners structural engineers. Largo is scheduled to be poured out by October 2021.

Project News

San Mateo County Parking Structure Tops Out

Largo Concrete recently topped out at the San Mateo County Parking Structure 2 project with general contractor Truebeck Construction. Located on the southwest corner of Veteran Blvd. and Brewster Ave., the structure will serve employees and visitors of the government services facility in Redwood City. Watry Design acted as the architect and structural engineer on the project and designed the structure to accommodate future parking demand.

Click here for more info.